Private &
shared rooms
Single rooms with en-suite or jack-and-jill bathrooms, plus shared dormitory layouts. Blackout, acoustic separation, and individual climate control support day and night shifts.
World Wide Modular is based in Austin, Texas. We design, factory-build, and deliver modular crew housing for construction, energy, mining, infrastructure, and government projects. We serve jobsites across Texas, including Central Texas, Dallas–Fort Worth, and the Houston area. For West Texas and the Permian Basin, we review the jobsite and delivery route to confirm the installation scope. We also take on projects elsewhere in the U.S. and internationally.

Compare a compact sleeper with a two-studio duplex. We also plan shared dormitories and larger camps around your headcount, shift schedule, and site utilities.
| Planning detail | 20-ft container sleeper | 40-ft container duplex |
|---|---|---|
| Unit dimensions | 20 ft nominal length | 40 ft nominal length |
| Beds | One sleeping room. Bed count depends on the floor plan. | Two private studios, planned for one bed each. |
| Bathrooms | Private bath if included in the layout, or shared camp facilities. | Two private three-quarter bathrooms, one per studio. |
| Site utilities | Power for lighting and HVAC. Add potable water and wastewater connections if plumbing is included. | Power for HVAC and appliances, plus potable water and wastewater connections for both studios. |
| What WWM handles | WWM coordinates layout and engineering, factory fabrication and fit-out, and freight to the jobsite. Where included in the agreement, WWM coordinates offloading, module setting, utility tie-ins, and commissioning. The agreement identifies who handles permits, site preparation, and each connection. | |
These are planning examples. Overall width and height, final occupancy, electrical loads, and connection points are confirmed on the project drawings. Off-grid utility options are planned around the site and crew size.
A crew that sleeps well works safely. Everything is sized to your headcount, shift pattern, and rotation schedule, from a 20-person pioneer camp to a full-scale workforce village, and every building is engineered for its climate.
Single rooms with en-suite or jack-and-jill bathrooms, plus shared dormitory layouts. Blackout, acoustic separation, and individual climate control support day and night shifts.
Larger rooms with a work area for site leadership, visiting engineers, and client representatives, set apart from the main crew blocks.
Commercial kitchens, cold storage, and dining halls sized for peak shift changeover. Grab-and-go and crib-room layouts are available for crews working away from camp.
Shower, restroom, and laundry buildings placed close to the sleeping quarters, with boot rooms and drying areas for hard work in harsh conditions.
Gyms, lounges, games rooms, quiet rooms, and outdoor gathering areas that help with rest, morale, and retention on long rotations.
Admin offices, medical and first-aid rooms, security gatehouses, training rooms, and storage, all on one camp plan.
Peak crew size, rotation schedule, and how long you need the camp are the three numbers that shape the plan. Share what you know.
Tell us about your crew ↗Remote doesn’t have to mean rough. We plan the services that turn a group of buildings into a place people can live during their rotation, and we build each building with those services in mind.
Discuss hospitality scope ↗Hot meals for every shift, packed lunches, and menus planned around nutrition, dietary needs, and local supply chains.
Room servicing, linen changes, and laundry schedules matched to your rotation, so rooms are turned around between crews.
Site-wide Wi-Fi, satellite or fiber backhaul, and in-room entertainment keep crews connected to home on long stints.
Access control, fire detection and suppression, first aid, and emergency planning are built into the camp layout from day one.
A workforce camp is infrastructure. It needs power, water, waste handling, and upkeep for as long as the project runs. We plan the full lifecycle up front so the camp keeps up with your workforce.
Site selection, layout, occupancy targets, and the permitting pathway are set for your jurisdiction, land agreement, and project timeline.
Modules are factory-built while the pads, roads, and utilities go in. Power generation, water and wastewater treatment, and data are commissioned before move-in.
Maintenance, utility management, room allocation, and occupancy reporting keep the camp running on schedule, delivered by WWM or alongside your chosen operator.
Modules can be added as the headcount grows, then decommissioned, moved, and reused at the next site when the work moves on.
Purchase, lease, and operating models vary by project. The final scope, responsible parties, and service levels are confirmed in the project agreement.
Mining, oil and gas, renewables, large construction and infrastructure projects, disaster response, agriculture, and defense and government operations. It fits any project where the workforce has to live near remote or temporary work.
Modules are fabricated while the site is prepared, which can cut delivery time by 30–50% compared with conventional construction. The real schedule depends on camp size, site access, utilities, and approvals. Share your target move-in date and we’ll test it against those factors.
Yes. Camps can be planned around on-site power generation, water treatment, wastewater handling, and satellite connectivity where there are no utility connections. We size these systems to your peak occupancy.
Hospitality and operations scope is set per project. We can include these services in a turn-key package or coordinate with an operator you already work with.
Modular buildings can be decommissioned, transported, and reconfigured for your next site, or the camp can be expanded or converted to longer-term housing.
The site location, peak and average headcount, rotation schedule, how long you need the camp, the level of accommodation you want, and any utility or access information you already have.
Start with the location, headcount, rotation schedule, and target move-in date. We’ll use your brief to begin the project conversation.
Request a Quote ↗Prefer to talk? 512-277-5037
business@worldwidemodular.com